דף הבית » פרויקטים
פרויקטים
2023
- Cyprus A3
- Lev 8 Completions
- Tamar SW
2023
2022
- Lev 8 Drill
2022
2021
Mari B Decommissioning (2021/23)
2021
2020
Major Projects
2020
2018
- Leviathan 7 Completions
- Leviathan 5 Completions
- Leviathan 3 Completions
- Leviathan 4 Completions
- Leviathan 7
- Leviathan 3
2018
2017
- Standby Period (2017/18)
- Leviathan 5
- Leviathan 7
- Leviathan 4
TAMAR 8 (2016/17)
2017
2014
- Karish Drill
- Tamar Southwest Drill
2014
2013
- Lev 2 P&A
- Tamar Completions (2012/13)
- ADIRA: Operating Bases (non-drilling operations)
- Noble Energy: Tamar SW-1, Karish 1, Alon C, Cyprus A-2, Cyprus A-1
- Pipeline Connections to the Tamar Platform and the first time transfer of gas flow to the shore
2013
2012
- ARG: Ishai
- Noble Energy: Levithian 4
- NOA 2 Completion, NOA 3 Completion
- Finkel 1, Finkel 1 Completion
- Tamar 4, Tamar 2 Completion, Tamar 3 Completion, Tamar 4 Completion, Tamar 5 Completion, Tamar 6 Completion
- Installation and devolping of the water transmission manifold
2012
2011
- Dolphin
- Pinnacles
- ATP: Shimshon
- Noble Eneregy: Dolphin 1, Tanin 1, Levithian 2, Levithian 3
- Noa 2, Noa 3
- Recerving the underwater gas pipeline
- Tamar 3, Tamar 5, Tamar 6, receiving and installing water pipeline system from Tamar Production Platform (150 km) to the production platforms expansion of gas terminal
2011
2010
- Noa
- Noble Energy: Levithian 1
- Mari B8, Mari B9, Mari B10 (increaced production project wich included Nabors company to build a modified rig on Mari B platfoem in order to produce more efficiently)
2010
2009
- Dalit 1, Tamar 2
2009
2008
- Tamar 1
2008
2006
- Mari B7
2006
2003
- Isramco: Nir 2
- Noble Energy: Hana 1
2003
2002
- Sdot Neft: Kishon Yam 1
- Mari B4, Mari B5, Mari B6
2002
2001
- IOC: Nordan
- Sdot Neft: Asher Yam
- Mari B3, Mari B3a
2001
2000
- Isramco: Nir 1
- Isramco: Romi 1
- Sdot Neft: Asher Yam
- Noa South, Mari B1, Mari B2
2000
1999
- Isramco: OR 1
- Isramco: OR South
- Isramco: Yam West
- Noa 1
1999